亚洲va中文字幕欧美不卡-亚洲va在线va天堂成人-亚洲va在线va天堂va手机-亚洲va在线va天堂va888www-久一视频在线-久污tv

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁(yè) News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 日日做日日摸夜夜爽 | 中文字幕日韩精品中文区 | 欧美亚洲另类一区中文字幕 | 青青草视频播放 | 日日摸夜夜摸人人嗷嗷叫 | 日本成人免费在线观看 | 午夜专区| 沈樵在线观看福利 | 手机看片久久国产免费不卡 | 永久免费在线看mv | 四虎影视在线影院在线观看 | 一级女性全黄久久生活片免费 | 伊人院 | 热热色国产 | 亚洲欧美日韩三级 | 色综合一区 | 羞羞答答免费人成黄页在线观看国产 | 婷婷久久综合网 | 伊人久久91 | 天天综合天天添夜夜添狠狠添 | 色综合久久五月 | 亚洲区精品 | 欧美一区二区不卡视频 | 网站在线观看mv视频 | 日本不良网站 | 天天色综网 | 日韩精品123 | 日日夜夜天天人人 | 手机看片福利日韩 | 亚洲免费高清视频 | 一级毛片a女人刺激视频免费 | 日韩在线播放视频 | 天天操天天摸天天曰天天干天天弄天天干 | 天天影视色香欲综合影视大全 | 五月天婷婷激情网 | 天天综合天天影视色香欲俱全 | 一区二区色 | 亚洲视频在线免费观看 | 色婷婷丁香六月 | 屁屁影院免费观看入口 | 啪啪网站免费 |