亚洲va中文字幕欧美不卡-亚洲va在线va天堂成人-亚洲va在线va天堂va手机-亚洲va在线va天堂va888www-久一视频在线-久污tv

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Principles and requirements of mold processing procedure

Release time:2024-03-20

commonlyMold processingThe type of production is single piece and small batch production. The basic principle of formulating the mold processing procedure is to ensure that the production cost is low and the production efficiency is high, and the mold products that meet the requirements of the design drawings can be processed reliably. Therefore, when formulating the process specification, we should start from the actual situation of the factory, make full use of the existing equipment, and use the advanced technology and experience at home and abroad as much as possible. The equipment used for mold processing and its process equipment shall have good versatility, and general machine tools, standard tools, modular fixtures, general fixtures and general measuring tools shall be widely used. Some advanced and special technologies such as CNC machine tools or automatic tool changing CNC machine tools and electro erosion machining can be used for the working surfaces of some parts with complex structure and shape, such as cavities and cores, punch dies and female dies. In other cases, conventional manufacturing processes can be used. If only a small number of special processes are required for processing, cooperative production can be considered to solve the problem. A reasonable machining process specification should reflect the following basic requirements.

3.jpg


(1) Reliability of product quality

All necessary measures to ensure product quality shall be fully considered and taken in the mold processing procedure to ensure that the accuracy, surface quality and other technical requirements required by the design drawings can be fully, reliably and stably met.


(2) Progressiveness of process technology

Under the existing conditions of the mold processing plant, the developed mold processing process specification shall, on the basis of adopting the mature process methods of the plant, absorb as much as possible the advanced process technology and process equipment of the same industry that are suitable for the situation of the plant, so as to improve the mold processing technology level. On the premise of ensuring the processing quality, various technical requirements and completing the tasks on time, the time required for mold processing shall be shortened as far as possible to ensure that the mold manufacturing can be completed before the delivery date.


(3) Economy

Under certain production conditions, a process scheme with less labor, materials and energy consumption is required to reduce production costs on the premise of ensuring product quality. So that the enterprise can obtain good economic benefits.


(4) Good working conditions

The established mold processing procedure needs to ensure that workers have good and safe working conditions. Mechanized or automatic measures should be used as much as possible to reduce some heavy manual labor.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 亚洲免费高清视频 | 在线观看91精品国产下载 | 欧美影院一区二区三区 | 四虎午夜 | 欧美一级特黄aaaaaa在线看首页 | 日韩亚洲欧洲在线com91tv | 日本视频免费看 | 中文字幕伦伦在线中文字 | 情侣国产在线 | 在线看亚洲 | 四虎在线播放免费永久视频 | 青草青视频 | 青青国产在线视频 | 亚欧乱色视频小说 | 青草视频在线观看完整版 | 婷婷六月久久综合丁香可观看 | 四虎成人免费网址在线 | 四虎精品久久久久影院 | 亚洲一区二区三区在线播放 | 亚洲久草 | 天堂网男人 | 日本 国产 欧美 | 日韩经典欧美精品一区 | 日本aa在线观看 | 天天躁夜夜躁狠狠躁躁 | 日韩18在线观看地址 | 日本福利片国产午夜久久 | 全免费观看一级 | 青青草免费公开视频 | 无人区国产大片 | 日韩欧美视频一区 | 欧美一区二区免费 | 亚洲国产中文在线 | 宅男午夜影院 | 午夜老司机福利 | 性做久久久久 | 亚洲伊人久久大香线蕉综合图片 | 欧美一级一一特黄 | 中文字幕波多野结衣免费视频 | 中文天堂在线视频 | 日韩在线不卡 |